Lagdera Constituency
Constituency code 029Area 6,096 sq kmPopulation 50,315 (2019 census)Registered voters 26,949
Lagdera lies west of Garissa town and has its main centre at Modogashe. It has six county assembly wards: Modogashe, Benane, Goreale, Maalimin, Sabena and Baraki.
The IEBC listed 26,949 voters in 2022. KNBS counted 50,315 people in Lagdera sub-county in 2019. Farah Maalim represented Lagdera in the 1990s and again from 2007 to 2013. Mohamed Hire Garane of KANU held it from 2017 to 2022. Mohamed Abdikadir Hussein of ODM won it in 2022.
Member of Parliament

ODM. Since Aug 2022
- Mohamed HireKANU, Aug 2017 to Aug 2022
- Farah MaalimODM, Jan 2008 to Mar 2013
- Farah MaalimFORD-Kenya, 1992 to 1997
Elections
General election of 9 Aug 2022
| Seat | Winner | Party | Votes | Runner-up |
|---|---|---|---|---|
| MP | Abdikadir Hussein Mohamed | ODM | 5,929 | Abdulqani Ibrahim Saytun, 4,863 |
Earlier general elections
8 Aug 2017
| Seat | Winner | Party | Votes | Runner-up |
|---|---|---|---|---|
| MP | Mohamed Hire Garane | KANU | 5,426, 39.5% | Mohamed Muktar Shidiye, 3,444, 25.1% |
4 Mar 2013
| Seat | Winner | Party | Votes | Runner-up |
|---|---|---|---|---|
| MP | Mohamed Muktar Shidiye | TNA | 7,014, 63.5% | Mohamed Hire Garane, 4,027, 36.5% |
| President, votes here | Uhuru Kenyatta | TNA | 5,530, 50.1% | Raila Odinga, 5,242, 47.5% |
About Lagdera Constituency
Lagdera constituency in Garissa County has Modogashe as its main town. Its six wards are Modogashe, Benane, Goreale, Maalimin, Sabena and Baraki. It is the most thinly settled part of the county at eight people per square kilometre. The CIDP links this to its size and poor infrastructure. Across the county most people live by herding camels, cattle, goats and sheep. Modogashe has a modern livestock market and a municipality. Water is the main constraint. The county finished the Qone to Modogashe water pipeline in FY 2024/25. Surveys have found lime and gypsum at Benane. The Lorian swamp area is listed for an irrigation study.
Economy and key figures
- County transfer to Modogashe Municipality
- KES 2,500,000 in FY 2025/26 and KES 11,000,000 since inception 2025/26 cob.go.ke
- Population of Lagdera sub-county
- 50,315 2019 garissaassembly.go.ke
- Land area of Lagdera sub-county
- 6,096.4 sq km 2023 garissaassembly.go.ke
- Population density of Lagdera sub-county
- 8 people per sq km 2019 garissaassembly.go.ke
- Population of Modogashe urban centre
- 11,011 2019 garissaassembly.go.ke
- County assembly wards
- 6: Modogashe, Benane, Goreale, Maalimin, Sabena and Baraki 2023 garissaassembly.go.ke
- Eligible voting population
- 26,949 2023 garissaassembly.go.ke
- Health facilities in Lagdera sub-county
- 1 hospital, 2 health centres and 13 dispensaries with 20 beds. The doctor to patient ratio is given as 1:54,000 2023 garissaassembly.go.ke
How people make a living
2
Livestock trade
Modogashe has one of the county's modern livestock markets. The CIDP also plans to renovate the Modogashe slaughterhouse.
Minerals
Surveys have found clay, building sand, lime and gypsum at places such as Benane in Lagdera. No geological mapping has been done.
Budget and revenue
5
| Year | Item | Amount |
|---|---|---|
| 2026/27 | NG-CDF allocation | KES 202.2 million ngcdf.go.ke |
| 2025/26 | NG-CDF allocation | KES 202.2 million ngcdf.go.ke |
| 2024/25 | NG-CDF allocation | KES 188.4 million ngcdf.go.ke |
| 2023/24 | NG-CDF allocation | KES 184.1 million ngcdf.go.ke |
| 2025/26 | NG-CDF disbursed against the 2025/26 allocation by 29 Oct 2026 (three releases between 12 Sep 2025 and 16 Mar 2026) | KES 80 million ngcdf.go.ke |
Major projects and NG-CDF spending
7
Qone to Modogashe water pipeline
A water pipeline to Modogashe in Lagdera. The Controller of Budget lists it as complete in FY 2024/25.
Upgrading of the Qone Modogashe water project
A follow-on upgrade reported 100 per cent complete on 30 Jun 2026.
Madina water pan
A 25,000 cubic metre water pan in Lagdera sub-county, completed in FY 2024/25.
Climate-proofed water pan
Excavation of a 50,000 cubic metre water pan in Lagdera. It was 55 per cent complete on 30 Jun 2026.
Second climate-proofed water pan
Excavation of another 50,000 cubic metre water pan in Lagdera. It was 40 per cent complete on 30 Jun 2026.
Benane water supply upgrade
A county tender to upgrade the Benane water supply.
Mega dam at Modogashe
One of four mega dams the CIDP plans in major laghas at Hulugho, Fafi, Modogashe and Dadaab. The four together are costed at KES 500 million.
Achievements
1
- 2025
The Qone to Modogashe water pipeline was completed in FY 2024/25. cob.go.ke
Challenges
2
Sparse services
Lagdera has the lowest population density in the county. The CIDP links this to the area's size and poor infrastructure.
Water shortage
The north and centre of the county lack groundwater and become hard to live in during dry periods.
Standout institutions
1
Modogashe livestock market
A modern livestock market listed in the CIDP.
For investors
Opportunities
Mining
Lime and gypsum occur at Benane. The CIDP notes that the county's mineral potential has not been mapped.
Irrigation
The CIDP plans a feasibility study for a gravity irrigation scheme in the Lorian area of Lagdera.
How to set up
- The Garissa County Investment and Development Authority Act, 2018 set up a county authority to promote investment. The Act makes it the focal agency that helps investors set up in the county. garissaassembly.go.ke
Who to contact
County Government of Garissa
info@garissa.go.ke, https://garissa.go.ke
In the news
Wards (6)
- Modogashe
- Benane
- Goreale
- Maalimin
- Sabena
- Baraki
