Teso North Constituency

Constituency code 225Area 261 sq kmPopulation 138,034 (2019 census)Registered voters 59,795

Teso North is one of seven constituencies in Busia County. It was created for the 2013 election when Amagoro Constituency was split into Teso North and Teso South. It has six county assembly wards.

Three of them are Malaba Central, Malaba North and Malaba South around the Malaba border crossing. The 2019 census counted 138,034 people in Teso North sub-county on 261 square kilometres. The IEBC listed 59,795 registered voters in 2022. Edward Oku Kaunya has been the MP since 2017.

Member of Parliament

MP
Edward Oku Kaunya
Edward Oku KaunyaParliament of Kenya
Edward Oku Kaunya

ODM. Since 2022

Elections

General election of 9 Aug 2022

SeatWinnerPartyVotesRunner-up
MPEdward Kaunya OkuODM23,403, 59.3%Lawi Mamai, 11,534, 29.2%
Earlier general elections

8 Aug 2017

SeatWinnerPartyVotesRunner-up
MPEdward Oku KaunyaANC14,442, 37%Arthur Papa Odera, 12,829, 32.9%

4 Mar 2013

SeatWinnerPartyVotesRunner-up
MPArthur Papa OderaURP12,688, 39.3%Albert Alexander Ekirapa, 6,848, 21.2%
President, votes hereRaila OdingaODM29,132, 90.2%Uhuru Kenyatta, 1,972, 6.1%

Results come from elections.co.ke, which links each figure to its source. All results for this place

About Teso North Constituency

Teso North is in the north of Busia County on the border with Uganda. It was created in 2013 when Amagoro constituency was split into Teso North and Teso South. Its six wards are Malaba Central, Malaba North, Malaba South, Angurai North, Angurai South and Angurai East. Most residents are Iteso. Malaba gives its name to three of the wards. It is one of the county's two border crossings into Uganda. It has a one stop border post and its own municipality. Most people farm on small plots. The area also has the Kakapel National Monument. It is the planned site of the Angololo dam that Kenya and Uganda would share. Floods around Malakisi and lightning strikes are recurring hazards.

Economy and key figures

Area
257.10 sq km 2026
Area (county plan)
261.0 sq km 2023
Population (NG-CDF office figure)
117,974 2026
Population of Teso North sub-county (KNBS census figure in the county plan)
138,031 2019
Projected population of Teso North sub-county
158,433 2027
Population density of Teso North sub-county
529 people per sq km 2019
Administrative units
2 divisions, 17 locations and 44 sub-locations 2023
County assembly wards
6 (Malaba Central, Malaba North, Malaba South, Angurai North, Angurai South and Angurai East) 2023
Malaba urban population (county fact sheet)
15,581 2022
Amagoro urban population (county fact sheet)
4,182 2022
IEBC constituency number
225 2026
Registered voters
59,795 2022
Registered voters
49,833 2017

What is grown here

1
Crop or productOutputYearWhere and notes
Sugarcane-2023The county plan puts Teso North in the LM2 marginal sugarcane zone with about 1,550 to 1,800 mm of rain a year.

How people make a living

2
  • Cross-border trade at Malaba

    The county plan says Busia and Malaba towns are gateways to Eastern and Central African markets. One stop border posts were set up at both towns.

  • Small-scale farming

    Agriculture is done mostly on small plots across the county. Teso North sits in the marginal sugarcane zone.

Budget and revenue

4
YearItemAmount
2025/26NG-CDF approved allocationKES 202.2 million
2024/25NG-CDF approved allocationKES 188.4 million
2023/24NG-CDF approved allocationKES 184.1 million
2022/23NG-CDF approved allocationKES 152 million

Major projects and NG-CDF spending

6
  • KMTC Kocholya Campus

    NG-CDF built a two-storey building with a lecture hall, laboratory and offices. The NG-CDF site gives no cost.

    Complete, NG-CDF

  • Angololo Multipurpose Transboundary Dam

    A dam shared by Kenya and Uganda for irrigation, drinking water for about 270,000 people, clean energy, fish farming and flood control. The county plan lists it as a flagship project with an estimated cost in millions of shillings.

    2023-2027, KES 12.7 billion, Planned, National and county government and PPP

  • Malaba trailer park

    Parking, offices, social amenities and security systems for trucks in Malaba town. The county plan lists it as a flagship project with an estimated cost in millions of shillings.

    2024-2026, KES 1.5 billion, Planned, National and county government

  • Malaba dry port

    A dry port with truck parking and offices in Malaba town. The county plan lists it as a flagship project with an estimated cost in millions of shillings.

    2023-2026, KES 1.2 billion, Planned, National government and other partners

  • Malaba Industrial Park

    An industrial park with plots, sheds and shared facilities for manufacturing, transport and storage firms, planned with Malaba Municipality. The county plan lists it as a flagship project with an estimated cost in millions of shillings.

    2023-2027, KES 700 million, Planned, County government and PPP

  • Kocholya Dam irrigation project

    Rehabilitation of the dam with irrigation and drinking water works for Teso North. The cost shown in the plan is unclear and is left out.

    2023-2027, Planned, National and county government

Achievements

2
  • 2023

    The county built a bus park in Malaba that serves about 150 matatus every day.

  • 2023

    The county put up high mast lightning arrestors at Kakapel and Korisai primary schools.

Challenges

4
  • Flooding

    The county plan lists Malakisi, Komiriai, Omaembei, Kamolo and Atiaket in Teso North among areas hit by floods.

  • Lightning strikes

    Chamasir, Kolanya, Katakwa, Aedomoru, Kakapel, Korisai and Koruruma are named as lightning-prone. School children are among those at risk.

  • Road accidents

    The Malaba to Bungoma highway is listed as a site of frequent accidents that hurt boda boda riders, pedestrians and children.

  • Land degradation and armyworm

    The plan lists land degradation and army worm outbreaks in Teso North.

Standout institutions

3
  • KMTC Kocholya Campus

    Kenya Medical Training College campus whose two-storey teaching block was funded by NG-CDF.

  • Kakapel National Monument

    The county plan names it as a site to market to local and foreign tourists.

  • Malaba One Stop Border Post

    One of two border posts set up in Busia County to ease the movement of people and goods into Uganda.

For investors

Opportunities

  • Logistics

    The plan proposes a trailer park, a dry port and an industrial park at Malaba to serve border traffic.

  • Tourism

    The plan wants to prepare Kakapel National Monument for local and foreign visitors.

  • Irrigated farming

    The Angololo and Kocholya dam plans aim to bring more land under irrigation.

Roads, power and transport

  • Malaba has a one stop border post on the route to Uganda. The Malaba to Bungoma highway runs through the area.

Who to contact

  • NG-CDF Teso North office

    P.O. Box 255-50408, phone 0103550660, tesonorth.ngcdf.go.ke