Kenya Railways Corporation
Parastatal. Attached to a ministry, run by its own boardKenya Railways provides rail and inland waterways transport. It was formed in January 1978 to take over the railways in Kenya after the East African Community collapsed in 1977. It develops the national and metropolitan rail network and runs the Madaraka Express, commuter and safari train services.
- Set up under
- Kenya Railways Corporation Act, Cap. 397
- Established
- Jan 1978
- Jobs and tenders
- Open jobs and tenders
- Website
- krc.co.ke
- info@krc.co.ke
- Phone
- +254 709 907000
- Office
- Workshops Road, off Haile Selassie Avenue, opposite Technical University of Kenya, Nairobi
- Postal address
- P.O. Box 30121-00100 Nairobi
- Social media
Leadership
Managing Director
Appointed by the Board of Directors- Philip MaingaManaging Director since Feb 2020
Chairman
Appointed by the President- Abdi Bare DualeChairman
Director, Board of Directors
- Mercy CherongisDirector, Board of Directors
What it does
- Rail and inland waterway transport services
- Upgrade and development of an integrated rail network
- National and metropolitan railway network development
- Passenger services including Madaraka Express and commuter rail
Its people also served at
- Railway Training InstituteMercy Cherongis
About Kenya Railways
Kenya Railways Corporation runs rail and inland waterway transport in Kenya. It operates the metre gauge railway from Mombasa to Malaba with its branch lines. It also runs the Standard Gauge Railway from Mombasa to Nairobi and Suswa. China Road and Bridge Corporation operates the SGR through Africa Star Railway Operation Company. KRC is taking over parts of that work in phases. KRC also runs the Madaraka Express, Nairobi and Mombasa commuter trains and safari trains to Nanyuki and Kisumu. It runs ships on Lake Victoria and the Railway Training Institute. It was formed by an Act of Parliament on 20 Jan 1978. In 2024/25 it moved 8.16 million tonnes of cargo and 5.06 million passengers. The Auditor-General flagged 529 illegally allocated land parcels and loan penalties.
Key figures
- Cargo moved
- 8.16 million tonnes, a 25% share of port throughput 2024/25 libraryir.parliament.go.ke
- Passengers moved
- 5.06 million 2024/25 libraryir.parliament.go.ke
- Staff on payroll
- 3,354 2024/25 libraryir.parliament.go.ke
- Lake Victoria vessels
- MV Uhuru I and MV Uhuru II 2024/25 libraryir.parliament.go.ke
- Railway Training Institute students
- 11,638 2024/25 libraryir.parliament.go.ke