Kenya Electricity Transmission Company Limited
Parastatal. Attached to a ministry, run by its own boardKETRACO plans, designs, builds, owns, operates and maintains high voltage transmission lines. It also builds regional power interconnectors. These lines form the backbone of the national grid.
- Set up under
- Incorporated on 2 Dec 2008 under the Companies Act, Cap 486, following Sessional Paper No. 4 of 2004 on Energy. Regulated under the State Corporations Act, Cap 446. Wholly owned by the Government of Kenya.
- Established
- 2 Dec 2008
- Jobs and tenders
- Open jobs and tenders
- Website
- ketraco.co.ke
- info@ketraco.co.ke
- Phone
- +254 20 4956000
- Office
- Kawi Complex, Block B, South C, Nairobi
- Social media
Leadership
Managing Director and Chief Executive Officer
Appointed by the Board of Directors
Tom ImboManaging Director and Chief Executive Officer since 30 Sep 2026
Past holders (2)
- Kipkemoi Kibias 2025 to 30 Sep 2026
- John Mativo Until 2025
Chairman of the Board of Directors
Mohamed M. AbdiChairman of the Board of Directors since 9 Feb 2024
Past holders (1)
- James Rege Dates not published
Company Secretary and General Manager Legal Services
Appointed by the Board of Directors
Florence MiteyCompany Secretary and General Manager Legal Services
General Manager, Systems Operations and Power Management
About KETRACO
KETRACO builds, owns and runs the high voltage power lines that carry electricity from power plants to the places where Kenya Power distributes it. It also builds the lines that link Kenya to the grids of its neighbours. The company was set up in December 2008 and is wholly owned by the government. By June 2025 it had built and switched on 6,044 km of high voltage lines and 45 substations. About 1,709 km of new line routes were under construction for completion by 2030. Its revenue in the 2024/25 financial year was KES 12.19 billion and it had 547 employees. The Auditor-General gave a qualified opinion on its 2024/25 accounts. Its head office is at Kawi Complex in South C, Nairobi.
Key figures
- High voltage lines built and switched on
- 6,044 km circuit length 2024/25 libraryir.parliament.go.ke
- Substations
- 45 2024/25 libraryir.parliament.go.ke
- Lines switched on during the year
- 406.1 circuit km 2024/25 libraryir.parliament.go.ke
- Lines under construction
- About 1,709 km route length 2024/25 libraryir.parliament.go.ke
- Employees
- 547 2024/25 libraryir.parliament.go.ke
- Ownership
- 100% government 2025