About the tender
Britam Holdings PLC requires a turnkey battery energy storage system (BESS) for passenger lifts at Britam Tower in Upper Hill, Nairobi. The work includes the design, supply, installation, integration, testing and commissioning of the backup power solution.
Key dates
- Questions by
- 28 Nov 2026 at 5:00PM page 7
What to prepare
The document lists these as mandatory. A bid missing one is usually rejected.
- Certificate of Registration/Incorporation page 9
- System-generated CR12 issued within last three months page 9
- Valid KRA Tax Compliance Certificate page 9
- Valid County Business Permit page 9
- Valid EPRA electrical contractor licence page 9
- Relevant NCA registration/category page 9
- OEM authorisation or support letter page 9
- Signed mandatory site visit certificate page 9
- Signed Form of Tender with declarations page 9
- Signed Britam Supplier Code of Conduct page 9
- Technical and commercial proposals page 9
- Completed BOQ and technical compliance schedules page 9
- Evidence of public liability and WIBA insurance page 9
Requirements
| Role | Qualification | Years |
|---|---|---|
| Project manager | CV | |
| Lead electrical engineer | CV | |
| BESS/controls specialist | CV | |
| HSE officer | CV | |
| Commissioning engineer | CV |
Lots (3)
- Lot 1Phase 1 High-Rise lifts base tender
- Lot 2Phase 2 Mid-Rise lifts option
- Lot 3Phase 3 PV integration and EMS option
Delivery
Britam Tower, Upper Hill, Nairobi
How bids are judged
Set out in the document. page 11
All details
- Closes
- 2 Dec 2026 at 5:00PM
- Tender number
- RFP-2026-11/005
- Sector
- Electrical works and energy
- Category
- Non-consultancy services
- Method
- Request for proposals
- Who can bid
- Open to foreign firms.
- Licences
- EPRA
- Location
- Nairobi County
- Bid validity
- 180 days
- Posted
- 13 Nov 2026