Kenya Urban Roads Authority
Parastatal. Attached to a ministry, run by its own boardKURA manages, develops, rehabilitates and maintains national trunk roads within urban areas. A road reclassification in January 2016 widened its role to all national trunk roads where they pass through towns. It works through ten regional offices that cover all 47 counties.
- Set up under
- Kenya Roads Act, 2007
- Website
- kura.go.ke
- info@kura.go.ke
- Phone
- +254 20 2722222
- Office
- Barabara Plaza, JKIA, off Airport South Road along Mazao Road, opposite Aviation House, Nairobi
- Postal address
- P.O. Box 41727-00100 Nairobi
- Social media
Leadership
Director General
Appointed by the Board of Directors
Silas KinotiDirector General since Jun 2020
Board Chairperson
Appointed by the PresidentHolder not published.
Director, Urban Roads Planning and Design
Wilfred R. OgingaDirector, Urban Roads Planning and Design
Director, Corporate Services
Reuben MayiendaDirector, Corporate Services
Director, Policy, Strategy and Compliance
Jacinta MwangiActing Director, Policy, Strategy and Compliance, acting
About KURA
The Kenya Urban Roads Authority builds and maintains national urban roads in Kenya's cities, municipalities and towns. It was set up under the Kenya Roads Act, 2007. Its roads include urban arterials, collectors and local streets. In June 2025 it managed 4,819.61 km of urban roads, about half of them paved. 81% of the network was in good or fair condition. The Road Maintenance Levy Fund is its main source of money. In 2024/25 it planned works on 4,070 km but did 2,662 km after mid-year budget cuts. These cuts followed a High Court ruling that moved KES 10.5 billion to counties. Its projects include traffic signals on the Nairobi Western Ring Road and the Ngong Road and Naivasha Road flyover.
Key figures
- Urban road network
- 4,819.61 km (2,469.76 km paved and 2,349.85 km unpaved) 2025 libraryir.parliament.go.ke
- Network in good or fair condition
- 81%, up from 74% 2024/25 libraryir.parliament.go.ke
- Roadworks done
- 2,662 km against a plan of 4,070 km 2024/25 libraryir.parliament.go.ke
- Roads upgraded
- 53 km 2024/25 libraryir.parliament.go.ke
- Performance-based contract maintenance
- 1,429 km 2024/25 libraryir.parliament.go.ke
- Traffic flow gain on Nairobi Western Ring Road after smart signals