Skip to main content
Skip to main content

Construction underway at Globe Roundabout as Nairobi River restoration takes shape

  • | The Star Video
    1,961 views
    Duration: 28s
    Works are ongoing around Globe Roundabout as part of the Nairobi River restoration project aimed at improving drainage and reducing flooding in the area. Subscribe for more videos: https://bit.ly/2mPyDy3 Connect with The Star Online Online on: WHATSAPP: https://bit.ly/2p8IC2e TELEGRAM : https://bit.ly/2oszlSe Sign Up To THE STAR WEBSITE for Exclusive content: FACEBOOK: https://bit.ly/2ot4G7m TWITTER: https://bit.ly/2mPoH7K INSTAGRAM: https://bit.ly/2mPoZLS Email NEWSLETTER: Visit The Star WEBSITE: https://www.the-star.co.ke/