- 249 viewsDuration: 7:34The Sh16 billion Taifa Gas LPG terminal at the Dongo Kundu Special Economic Zone in Mombasa is nearing completion, with commissioning targeted for October. The facility, being developed on a 30-acre site near the Port of Mombasa, will have a massive storage capacity of 30,000 metric tonnes through 12 storage tanks. LPG will be supplied from the Kipevu Oil Terminal through a 3.5-kilometre pipeline.